{"id":11465,"date":"2026-11-02T05:00:36","date_gmt":"2026-11-02T10:00:36","guid":{"rendered":"https:\/\/fouloistech.info\/ma\/?p=11465"},"modified":"2026-10-29T17:15:58","modified_gmt":"2026-10-29T21:15:58","slug":"5th-grade-nimmons-11-02-audio-1-goal-setting","status":"publish","type":"post","link":"https:\/\/fouloistech.info\/ma\/2026\/11\/02\/5th-grade-nimmons-11-02-audio-1-goal-setting\/","title":{"rendered":"5th Grade, Nimmons, 11-02 \u2013 Audio 1: Goal Setting"},"content":{"rendered":"<p><strong><a href=\"https:\/\/fouloistech.info\/ma\/category\/smith\/5th\/\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-10623\" src=\"https:\/\/fouloistech.info\/ma\/wp-content\/uploads\/2026\/08\/CanvasClass26_53_Conley-300x169.png\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/fouloistech.info\/ma\/wp-content\/uploads\/2026\/08\/CanvasClass26_53_Conley-300x169.png 300w, https:\/\/fouloistech.info\/ma\/wp-content\/uploads\/2026\/08\/CanvasClass26_53_Conley.png 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Announcements:<\/strong><\/p>\n<ol>\n<li><span style=\"color: #ff0000;\"><strong>The last day for any late work is Friday, January 8th!<\/strong><\/span>\n<ol>\n<li>All work not completed by then will remain a zero.<\/li>\n<li>Any work assigned after then is due the same day.<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n<p><strong>Objective:<\/strong><\/p>\n<ul>\n<li>Students will set their goals for this school year and script them for an audio project to see how Media Arts can relate to things outside of the computer lab.<\/li>\n<\/ul>\n<p><strong>9:45-9:55: Start of Class<\/strong><\/p>\n<ol>\n<li>Students will log into <a href=\"https:\/\/pgcps.instructure.com\/\">their Canvas account<\/a>, which is where they will hand in work at the end of class.<\/li>\n<li>Students will enter and go to the front of the class, where Mr. Smith will walk them through the assignment for the day.<\/li>\n<\/ol>\n<p><strong>9:55-10:35: Instruction &amp; Student Work<\/strong><\/p>\n<ol>\n<li>Students will work on Lesson 1 of the Audio Unit.\n<ol>\n<li><a href=\"https:\/\/fouloistech.info\/Lessons_0-5\/5-unit-audio.html\">Rubric, Objective, Standards, and links can be found here<\/a>.<\/li>\n<li>Students will use their <a href=\"https:\/\/pgcps.instructure.com\/\">Canvas accounts<\/a> to upload their completed work today.<\/li>\n<li>The remainder of class time is provided for students to finish late and missing work.<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n<p><strong>10:35-10:45: End of Class<\/strong><\/p>\n<ol>\n<li>Once completed, they will shut down their computer and help someone else with this process (if needed) before lining up to return to class.<\/li>\n<\/ol>\n<p><span style=\"color: #ff0000;\"><strong>Missed Assignment?<\/strong><\/span><\/p>\n<ol>\n<li>Parents: If you are reading this because your child was absent and they need to make up the work, look over the lesson above.\u00a0<a href=\"https:\/\/pgcps.instructure.com\/\">The work should be submitted in Canvas<\/a>.<\/li>\n<li>Note the end date for late work in the Announcements above. If the Canvas assignment is not accepting work, your child missed the deadline to hand work in!<\/li>\n<li>Previous Lessons: None this Quarter<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Announcements: The last day for any late work is Friday, January 8th! All work not completed by then will remain a zero. Any work assigned after then is due the same day. Objective: Students will set their goals for this school year and script them for an audio project to see how Media Arts can <a href=\"https:\/\/fouloistech.info\/ma\/2026\/11\/02\/5th-grade-nimmons-11-02-audio-1-goal-setting\/\" class=\"more-link\">...continue reading<span class=\"screen-reader-text\"> \"5th Grade, Nimmons, 11-02 \u2013 Audio 1: Goal Setting\"<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9,30],"tags":[],"class_list":["post-11465","post","type-post","status-publish","format-standard","category-5th","category-smith","h-entry","hentry","h-as-article"],"_links":{"self":[{"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/posts\/11465","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/comments?post=11465"}],"version-history":[{"count":2,"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/posts\/11465\/revisions"}],"predecessor-version":[{"id":11526,"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/posts\/11465\/revisions\/11526"}],"wp:attachment":[{"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/media?parent=11465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/categories?post=11465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fouloistech.info\/ma\/wp-json\/wp\/v2\/tags?post=11465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}